The Application
Read the application documents for the Kohimarama Comprehensive Care Retirement Village.
Read the application documents for the Kohimarama Comprehensive Care Retirement Village.
This project by Ryman Healthcare Ltd is to construct a retirement village in Kohimarama on a currently undeveloped site, accessed from Kohimarama Rd and John Rymer Place, in eastern Auckland.
It will provide 173 care beds, including hospital care and specialist dementia care and 123 independent apartments.
On 12 February 2021, Ryman Healthcare Ltd lodged a resource consent application with the EPA for the project.
On 19 February 2021, the EPA determined that the application complied with the requirements set out in clause 3(1) of Schedule 6 of the Act, and could be provided to the Expert Consenting Panel appointed to determine the application.
Decision on Compliance for the Kohimarama Comprehensive Care Village project (PDF, 43KB)
At any time before the expert consenting panel issues its final decision on the resource consent application, it can request further information under clause 25(1)(a) Schedule 6 of the Act.
View the information requested and the responses to the information requests
Cover letter accompanying the application documents (PDF, 69KB)
Resource consent application form (PDF, 299KB)
Assessment of environmental effects report (PDF, 1.6MB)
Appendix A - Certificate of title 98B-894 (PDF, 231KB)
Appendix A - Certificate of title 312220 (PDF, 201KB)
Appendix B - List of notified property owners (PDF, 80KB)
Appendix C - BECA site assessment plans and drawings (PDF, 12.8MB)
Appendix C - BECA visual simulations (PDF, 11.6MB)
Appendix D - BECA architectural site and floor plans and drawings pgs 1-30 (PDF, 8.3MB)
Appendix D - BECA architectural site and floor plans and drawings pgs 31-62 (PDF, 6.9MB)
Appendix D - Design Squared Landscape plans (PDF, 16.8MB)
Appendix D - Design Squared Landscape plan details (PDF, 8.9MB)
Appendix E - BECA architectural design statement (PDF, 1.4MB)
Appendix F - Auckland Council Urban Design panel recommendations (PDF, 729KB)
Appendix G - Design Squared Landscape technical report (PDF, 8.4MB)
Appendix H - Arboricultural assessment report (PDF 2.9MB)
Appendix I - Transportation assessment report (PDF, 3.5MB)
Appendix J - Proposed conditions of consent (PDF, 432KB)
Appendix K - Ecological assessment report (PDF, 3.7MB)
Appendix L - Civil design report (PDF, 4.1MB)
The following attachments A-G are part of Appendix L - the Civil design report.
Attachment A - Topographic survey (PDF, 3.2MB)
Attachment A - Supplementary survey on boundary (PDF, 11.6MB)
Attachment B - Hydrant testing result (PDF, 1MB)
Attachment C - TEKTUS Consultants concept wastewater network extension (PDF, 2.1MB)
Attachment C - Utilities providers correspondence (PDF, 820KB)
Attachment D - TEKTUS Consultants erosion and sediment control plan (PDF, 1.5MB)
Attachment D - USLE calculations (PDF, 172KB)
Attachment E - TEKTUS Consultants wastewater network capacity analysis (PDF, 34KB)
Attachment F - TEKTUS Consultants Drawing list contents page including locality plan (PDF, 8.7MB)
Attachment G - Part 1 - Site topographic survey (PDF, 2.8KB)
Attachment G - Part 2 - BECA Storm Water calculations (PDF, 23.9MB)
Attachment G - Part 3 - TEKTUS Consultants stream calculations (PDF, 279KB)
Attachment G - Part 4 - Pre-application memo (PDF, 5.3MB)
Attachment G - Part 5 - Private drainage as-built drawings (PDF, 1MB)
Attachment G - Part 6 - Storm filter sizing (PDF, 89KB)
Attachment G - Part 7 - TEKTUS stormwater management plan (PDF, 12.9MB)
Attachment G - Part 8 - TEKTUS infrastructure plan (PDF, 4.1MB)
Appendix M - Tonkin and Taylor - Groundwater take report (PDF, 8.9MB)
Appendix O - Owners of Adjacent sites redacted version (PDF, 151KB)
Appendix P - Clinton Bird Urban Design Ltd - Urban Design review report (PDF, 2.7MB)
Appendix Q - Tonkin and Taylor - Ground contamination assessment report (PDF, 7.6MB)
Appendix R - Tonkin and Taylor - Geotechnical assessment report (PDF, 26.5MB)
Appendix S - RA Skidmore Urban Design - Landscape and visual effects assessment report (PDF, 4.6MB)
Appendix T - Consultation emails redacted version (PDF, 1.1MB)
Appendix T - Location map (PDF, 2.9MB)
Appendix T - Consultation responses redacted version (PDF, 1.0MB)
Appendix U - Clough and Associates - Archaeology assessment report (PDF, 6.8MB)
On 15 April 2021, the applicant provided written approvals from the Ministry of Education on behalf of Selwyn College.
Auckland Council affected person form signed by Ministry of Education (PDF, 2MB)
BECA drawings and transportation assessment report signed by Ministry of Education (PDF, 9MB)
Appendix V - Flow Transportation Specialists - Peer review summary report (PDF, 1.3MB)
Appendix W - Isthmus - Peer review of landscape and urban design (PDF, 620KB)
Appendix X - Auckland Unitary Plan objectives and policies (PDF, 213KB)